Planning an IT Change or Migration: A Small Office Checklist
Most IT trouble in a small office comes from change: a new email service, files moved to the cloud, a replacement server, a new router, an office move. The work itself is usually straightforward. What goes wrong is the planning around it: something nobody knew depended on the old system, a backup that was never tested, no way back when the new system misbehaves on Monday morning. This checklist covers the steps that prevent those problems, sized for an office of 1 to 25 people.
1. Define the change and what "done" means
Write two or three sentences: what is changing, why, and how you will know it worked. For example: "Move the shared drive from the office NAS to cloud file storage. Done when every staff member can open, edit and save their files from the new location, and the NAS copy is no longer being used." A clear definition keeps the job from growing and tells you when to stop.
2. Take inventory
List everything that touches the system being changed:
- People: who uses it, and how. Ask them; they will name uses nobody wrote down.
- Devices: which computers, phones, printers and scanners connect to it (a scanner that saves to a network folder is easy to forget).
- Data: how much, where, and how much changes each day. The Data Storage Converter helps when tools report sizes in different units.
- Connections: other software that reads from or writes to it, scheduled jobs, shared links, mapped drives.
- Names and records: DNS records, email routing, certificates.
- Accounts and licenses: who administers it, what renews when, and what notice the old provider needs.
3. Back up, then test the backup
Before touching anything, make a full backup of the system being changed and restore part of it to a separate location to prove it works. Also record the current configuration: screenshots of settings, exported configuration files, and a copy of the DNS zone if records will change. This is your way back if everything else fails. Our guide to backups and test restores explains how to do this properly.
4. Work out how long the data move takes
Large transfers take longer than people expect. Worked example: 300 GB of shared files uploaded over a 50 Mbps connection.
- 300 GB is 300,000,000,000 bytes, which is 2,400,000,000,000 bits (8 bits per byte).
- At 50,000,000 bits per second: 2,400,000,000,000 / 50,000,000 = 48,000 seconds, about 13.3 hours.
That is the line-rate figure; the real transfer will be slower because of protocol overhead, other traffic and the receiving service's limits. A common approach is to copy the bulk in advance (over nights or a weekend), then on change day copy only what has changed since. The Bandwidth Calculator does this arithmetic for your own figures.
5. Choose the timing
- Pick a quiet period, away from month-end, payroll, tax deadlines and busy seasons.
- Make sure the people who can fix problems are available on the change day and the first working day after.
- Check the old provider's contract end date so you do not lose access before you are ready.
- If DNS records will change (for email or a website), lower their TTL in advance. If a record's TTL is 86,400 seconds (24 hours), set it to something short like 300 seconds at least 24 hours before the change, so resolvers pick up the new address quickly, then raise it again afterward. Note the original values first. See the domains and DNS guide for what each record does.
6. Rehearse
Try the change on a small scale first: one user's mailbox, one folder, one spare computer. Check that files open, permissions are right, links work, and nothing unexpected breaks. Time the rehearsal; it tells you how long the real thing will take.
7. Write the rollback plan
Decide before you start how you will undo the change, and when you will decide to. A rollback plan has three parts:
| Part | Example |
|---|---|
| Trigger | "If staff cannot open and save files on the new storage by 10 am Monday, we roll back." |
| Steps | Point mapped drives back at the NAS, which has been left untouched and read-only. |
| Data | Copy any files saved on the new storage since the change back to the NAS. |
The simplest rollback is to leave the old system intact until the new one is proven. Do not delete, wipe or reformat anything during the change.
8. Tell people
Tell staff what is changing, when, what they need to do (save and close files, sign in again, update a phone app) and who to call. Send a short reminder the day before. A message that comes from inside the business, through a channel staff already trust, also helps them spot fake "please sign in to the new system" emails that attackers send around changes.
9. Make the change, then verify
- Follow the written steps, ticking each off, and note anything that differs from the rehearsal.
- Test as a normal user, not as an admin: sign in, open, edit, save, share, print, scan.
- Check the things from your inventory list one by one.
- Check that the new system is being backed up, and run a test restore from it.
- Be available on the first working day for the problems that only show up then.
10. Retire the old system, slowly
Keep the old system available but unused, read-only if possible, for an agreed period, such as a month. Only once the new system has been in daily use and has a tested backup of its own should you cancel the old service or wipe old hardware. Before wiping, confirm no data exists only on the old system, and dispose of drives securely.
11. Update the records
Update the IT documents: where data now lives, new admin accounts and where their credentials are kept, new DNS values, renewal dates, and support contacts. Note what went well and what you would do differently; the next change will be easier.
When to bring in help
Bring in an IT professional for email migrations with years of history, anything involving a domain's email routing, server replacements, office moves with cabling, or when the inventory turns up connections you do not understand. Ask them for a written plan that includes the backup, the rehearsal and the rollback.